Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
Hardwick Lane | Route One
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

Case Study

The main part of the works were carried out at Hardwick Lane site compound to reduce possession times on-site.

Case Study Case Study

Hardwick Lane

Client: AMCO

Location: Yorkshire and the Humber

Products: Hytec Sheet Membrane and Geo 1000 (Stirling Lloyd)

The works included fixing wall trims and installation of the Hytec Sheet Membrane and Geo 1000 to the bridge deck.

The majority of works were carried out utilising a MEWP due to the structure being elevated on lifting rams to enable it to be transported from the compound to its site location.

This on-site works included welding of the Hytec Sheet Membrane and installing top layer of Geo 1000

  • 260m2 Eliminator One Coat and 100m2 of Hytec Sheet Membrane carried out in 3No Shifts
  • ECI with AMCO to reduce possession times on-site